The driveway is half done, but they’ll wait until most of the deliveries are done before the top coat. The landscaper was over shooting things out, but there is a ton of work left to go. Also trying to pick out appliances and plumbing so it can be delivered and installed in 10 days or so. The granite is ordered (see left sample) and the finish carpenters are doing the red oak floors and painting this week. Pics:
Driveway going around the side:
Granite samples (left is what we picked)
Cabinets fully installed:
Deck with railing:
Railings and Stairs:
Tile installed (no grout):
Front Steps (I need to have them fix this: