Thursday, November 4, 2010
Wednesday, June 2, 2010
Juggling Tasks
The last 10 days has been full of tasks and phone calls. Things are moving along, but issues have come up with lights, plumbing, floors, and landscaping. Trying to get all the contractors to do the right thing while managing the finance end of it is hard. Nevertheless, the bank is all set to close, they’ve given me the loan, and we should have the cash to put down in the right place in time.
Today I started the garden, using the mound of dirt they left me and some boards that weren’t used. It isn’t done, but I took a couple pics of the area.
Also here are a couple pics of the almost finished floors and the kitchen island.
And a pic of the fireplace with TV mount
Wednesday, May 26, 2010
On Track
So our closing is just about set for June 16th, about 3 weeks away. As of now, the landscaper, painters, and flooring guys are finishing up, and the appliances and counters will be installed in the next couple days. Some time next week the plumbers will be there to finish their work and the driveway will be re-paved, and then the house will be complete. By the end of June we ought to be fairly comfortable and knee deep in projects.
Here are a bunch of current pics:
Dining room wainscoting:
Master bedroom with bench:
Frpnt steps and door (to be painted)
Japanese Maple out front:
Sunday, May 16, 2010
Driveway & Yard
The driveway is half done, but they’ll wait until most of the deliveries are done before the top coat. The landscaper was over shooting things out, but there is a ton of work left to go. Also trying to pick out appliances and plumbing so it can be delivered and installed in 10 days or so. The granite is ordered (see left sample) and the finish carpenters are doing the red oak floors and painting this week. Pics:
Driveway going around the side:
Granite samples (left is what we picked)
Cabinets fully installed:
Deck with railing:
Railings and Stairs:
Tile installed (no grout):
Front Steps (I need to have them fix this:
Monday, May 10, 2010
Cabinets
This weekend the cabinets and bath vanities were installed. We’re supposed to get the granite place to measure and then install next week. I need to order the final plumbing fixtures ASAP, since the sink needs to be cut into the granite. I also need to commit to the stove type (slide-in or drop-in) before the granite is cut.
Also this week, I committed to paying extra to have the driveway go to the back of the garage, so that we can store another car there.
The back yard was graded, and this week I also need to meet with the landscaper to talk about the stone patio.
Fireplace and TV hookup – Fireplace mantel will be installed this week too.
Wednesday, May 5, 2010
So Many Decisions
Cabinets in boxes ready to install:
Interior finish (before paint)
Monday, April 26, 2010
After Vacation
While we were gone for a week, I see a few things that have happened. The deck is framed, the columns out front are there, the central vac is in, the gas lines are in, the whole house is insulated, and the place is ready for plaster. They owe me an updated kitchen plan and I am going to make them swap out the shower valves for something that isn’t the cheapest there is. I looked at what they were and called Jon, who reminded me that since shower valves are buried in walls, they should be a good brand.
Nevertheless, here are some pics from last night: