Wednesday, May 26, 2010

On Track

So our closing is just about set for June 16th, about 3 weeks away.  As of now, the landscaper, painters, and flooring guys are finishing up, and the appliances and counters will be installed in the next couple days.  Some time next week the plumbers will be there to finish their work and the driveway will be re-paved, and then the house will be complete.   By the end of June we ought to be fairly comfortable and knee deep in projects.

Here are a bunch of current pics:

Dining room wainscoting:

IMG_7657

Master bedroom with bench:

IMG_7673

 

Frpnt steps and door (to be painted)

IMG_7677

 

Japanese Maple out front:

IMG_7676

Sunday, May 16, 2010

Driveway & Yard

The driveway is half done, but they’ll wait until most of the deliveries are done before the top coat.  The landscaper was over shooting things out, but there is a ton of work left to go.    Also trying to pick out appliances and plumbing so it can be delivered and installed in 10 days or so.  The granite is ordered (see left sample) and the finish carpenters are doing the red oak floors and painting this week.  Pics:

Driveway going around the side:

Driveway

 

Granite samples (left is what we picked)

GraniteSamples

 

Cabinets fully installed:

IMG_0382

 

Deck with railing:

IMG_0384

 

Railings and Stairs:

StepsRailings

 

Tile installed (no grout):

IMG_0387

 

Front Steps (I need to have them fix this:

MistakeSteps

Monday, May 10, 2010

Cabinets

This weekend the cabinets and bath vanities were installed.  We’re supposed to get the granite place to measure and then install next week.  I need to order the final plumbing fixtures ASAP, since the sink needs to be cut into the granite.  I also need to commit to the stove type (slide-in or drop-in) before the granite is cut.

Also this week, I committed to paying extra to have the driveway go to the back of the garage, so that we can store another car there.

The back yard was graded, and this week I also need to meet with the landscaper to talk about the stone patio.

IMG_0376

Fireplace and TV hookup – Fireplace mantel will be installed this week too.

IMG_0374

Wednesday, May 5, 2010

So Many Decisions

I haven't written here in at least a week, but that time has been full of things happening. In that time, we've picked lighting for the whole house (over budget of course), had the yard graded, watched the plaster crew do the whole place, saw the garage floor being poured, and started to see finishing materials brought in. As of now, there are tons of things left to decide, and not a ton of time left to get them done. I think the kitchen cabinets and the driveway are going in within a couple days, and I need to choose paint, tile, and plumbing fixtures. Today we also picked the fireplace surround and mantel, and let the kids pick their rooms. I will have more pics soon, but for now, I just wanted to list out whats been done. By next week all of the trim and doors will be in and the painters will start. It will be crazy that the kitchen may be in and almost ready. Next thing you know, the yard will be sprayed on and they'll be talking about closing.

Cabinets in boxes ready to install:


Interior finish (before paint)